The Wind Turbine was installed in 2011.
The various sections of the wind turbine completed the journey from Lyness to Ore Brae and were assembled in situ.
Here are some photographs showing the various stages.
In order to take the left-hand turn from Lyness to Ore Brae required making a circular tour of the Hoy Hotel! Once up the hill and at the site the sections had to be lifted off the trucks and then be lifted on top of each other and secured into position.